Separated aggregate, metal and timber streams on an industrial recovery line
The Standard

One Standard. No discretionary math.

C&D Verified measures your facility’s recovery performance from its own weighbridge records. An accredited verifier tests the evidence behind it before CMRD publishes the rate and the period it covers.

The same measurement, evidence and decision rules apply to every processing line.

Standard —Calculation rules —Rolling 12-month basis
Scope

What it does not claim

  • It is not a prediction of performance between verification cycles.
  • It is not a project-level diversion figure.
  • It is not a statement about any single load.
From scale to registry

The verification lifecycle

Every published rate follows the same evidence chain.

01

Inbound allocation

Allocate each received ton to the controlled material taxonomy so the material ledger agrees with measured inbound tonnage.

§70.3
02

Processing

Record the physical work performed without treating crushing, grinding, baling or sorting as a recovery outcome.

§70.2
03

Disposition and destination

Assign every outbound ton an outcome and name where it went. Disposition, not processing, determines recovery treatment.

§70.2
04

Evidence

Attach the tickets, settlements, manifests and destination records that support each claimed outcome.

§35.3 · §55.7
05

Automated validation

Test allocation, inventory continuity, evidence coverage and mass balance before a month can advance.

§30.2 · §55.8
06

Independent verification

An accredited verifier samples transactions, tests destinations and records findings independently of the facility.

§42.4 · §78.5
07

Certification decision

CMRD makes the certification decision separately from the verifier who issued the report.

§43.2 · §79.1
08

Publication

Publish the verified rate with its scope, period, Standard version and current certification state.

§57 · §81.7
Rate definitions · §57

Three rates. One strict order.

Verified never exceeds evidence-supported, which never exceeds reported.

01

Reported

The recovery rate your facility reports from its disposition records.

02

Evidence-supported

The reported rate after unsupported recovery claims have been removed.

03

Verified

The evidence-supported rate after independent testing, findings and any verifier adjustments.

Separate basis

LEED-compatible

A distinctly labelled calculation compatible with LEED diversion treatment. It is not the CMRD verified rate.

Published taxonomy

Controlled vocabularies

Look up what a material, process or disposition means and what credit it can earn.

Loading the published Standard…
Mass balance · §30.2

Every ton must reconcile.

Beginning inventory + inbound = outbound + ending inventory + accounted process adjustment + unexplained variance.

Monthly tolerance—Applied by the published calculation rule.
Public meaning

Certification states

The registry states current standing as plainly as certification.

Applicant

The facility is enrolled but has no published verified rate.

Reporting

The facility is submitting records and has not yet been certified.

C&D Verified

A current certification decision supports publication of the verified rate.

Certified with qualification

The rate is published with a clearly stated limitation or condition.

Suspended

Certification is not current; the registry shows no current verified rate.

Expired

The certification period ended; the historical record remains visible without a current rate.

Withdrawn

Certification was withdrawn and no current verified claim may be made.

Not certified

The evidence or findings did not support certification; no verified rate is published.

Current publications

Version register

Loading version register…
Approval boundary

CMRD is not approved by USGBC or GBCI.

CMRD is not approved, endorsed, recognised or accredited by USGBC or GBCI. A LEED-compatible rate means only that the rate is calculated on a basis compatible with LEED rules.

The Standard requires a documented LEED crosswalk before CMRD seeks any approval. That pathway remains an open item; no approval has been sought or granted. §26.2

Active maintenance

Open decisions for v1.0

01

Rate formula

The verified recovery rate formula and its relationship to the LEED-compatible facility-average rate

02

Material classification

Material classification rules for beneficial use, fines and soil, biomass and wood fuel, transfer to secondary processors, and ambiguous end uses

03

Mass balance

Mass-balance variance thresholds and the treatment of inventory, moisture change and processing loss

04

Measurement

Scale certification and alternate measurement requirements

05

Evidence

The proof-of-disposition evidence hierarchy and minimum documentation by disposition type

06

Sampling

Transaction sampling, statistical confidence, materiality, risk tiers and destination confirmation

07

Verifier structure

Verifier qualification, training, independence, accreditation and certification-body structure

08

Certification lifecycle

Certification term, conditional certification, renewal, suspension, withdrawal and recertification

09

Records

Minimum record-retention and data-integrity requirements

Public comment

Contribute evidence to the Standard.

Submit a technical comment on one of the named open questions.